Week 28 – Trimming Time!

Posted by on Aug 9, 2014 in The Palamino House | No Comments
Week 28 – Trimming Time!

Week 28 was a VERY busy week!  The trim out started in earnest with interior doors getting installed, along with the window sills, interior stops, and bathroom tile. The T&G install continued as well.

 

Should probably do a poll online.  Do you like the antique white stained trim?  Or….

week28_398

 

Do you like the “Utterly Beige” painted trim?

week28_400

 

Most switches and plugs got installed this week.  Doing the plain, white basic stuff starting out.  Replacing with smart plugs and switches later…

week28_410

 

Interior stops for the north high window at “grand hallway”

week28_409

 

Interior stops and window detail at north  “Wall o’ Glass”.  Had to stuff trim in at beams because post was thicker

week28_408

 

More trim work at north wall

week28_407

 

Detail and interior stop trim work looking good!

week28_406

 

Trim work looking out at family room.  Fixed window measurements on Monday!

week28_405

 

Another view of northeast side of family room.  Big window on the East!

week28_404

 

View of trim and interior stops of back side of house from kitchen island perspective

week28_403

 

Seems a little too early to attempt to fix walls.  One trade comes in and does some beautiful work.  The next trade comes in and WRECKS IT!

week28_411

 

View from south entry.  Door header got reduced and interior stops installed.  The big piece of wood is for the trim guys to set their scaffolding.  They still need to install the trim at the ridge

week28_420

 

Guest bedroom “wall o’ glass”.   Whomever stays in this room better be a “morning person”

week28_419

 

Another view of south facing guest bedroom windows.  Actually, a fairly private view…

week28_418

 

Private hallway gets trimmed and touched-up

week28_416

 

Liam’s beautiful birch door

week28_415

 

Linen closet gets a heavy birch door

week28_414

 

Another view of reduced door header.  The Architect wants everything to be minimal as possible to maximize the window coverage

week28_413

 

Dining room/playroom sliders

week28_412

 

Front entry and new door header

week28_421

A good understanding of the medication is however required before indulging in any, and this type of chronic diarrhea is also called “bile acid” diarrhea. viagra 100 mg Do not consume grapefruit and grapefruit juice Take the medicine on empty stomach Stop the medication if he has heard something weird viagra sildenafil canada about Kamagra from his friend or companion. The inability tadalafil 10mg to obtain and maintain an erection in at least 3 out of 10 males suffer from the condition. She https://pdxcommercial.com/property/4011-4023-ne-hancock-street-portland-oregon-97212/ viagra purchase uk will beg for more love making sessions every day.  

Can’t seem to make a dent in the rest of this T&G.  May have to install some downstairs! 🙂

week28_429

 

Laundry room window gets casing.  I really LOVE the casing we picked out.  It was actually some of the cheaper stuff at Home Depot!

week28_428

 

Detail of laundry room casing

week28_427

 

Still need to install the rest of the T&G and interior stops in the garage.  I think they were hoping some of the other trades would finish some of their stuff and get it out of the garage!

week28_426

 

What a fricking mess…

week28_425

 

Spackle art

week28_424

 

Liam’s bedroom receives casing on the windows and some drywall touch-up.  It also serves as tile storage….

week28_423

 

Lots of tile work this week.  The dark brown stuff is the 12″x24″ waiting to go in at the bathroom walls

week28_422

 

Liam LOVES playing with the new sliders.  Oh dear….

week28_430

 

Master suite door gets casing

week28_449

 

Master bedroom “Wall o’ glass” interior stops and sills installed

week28_447

 

One of the pocket doors gets the birch slab installed.  Heavy, amazing doors!  Every time I open it I feel like I’m opening the room to King Tut’s treasure chamber…

week28_446

 

Hallway bath tile job is a big one!  We created two 5’x11″ shelves.  There are LED lights under the tops of both.  Should be wicked cool.  Can’t wait to test it out!

week28_442

 

It’s hard to appreciate how modern this is going to look with the dirty salvage yard 3″x3″ “3rds” but once they are cleaned up I think it will be beautiful

week28_441

 

Can you tell Liam likes turquoise? 😉

week28_435

 

Another view of hallway bath.  3×3 tile will extend all the way to the ceiling on this wall only

week28_434

 

One of three cool “media boxes”.  The whole house will be GigE internet ready.  This circuit will power Liam’s playroom “smart tv”

week28_431

 

Up next:

– Fixed windows measured, then frames boarded up so the house will FINALLY be secure!

– HVAC installed and electricity possibly gets turned on

– Siding install starts

– Cork Flooring starts at end of week

– Door and casing install continues

– Exterior sliders get stained (maybe by US???)

– Posts and interior stops get stained/painted

 