Week 19 – And The Foam Begins To Flow….
Week 19 started off with a bang as the foam truck arrived (actually on Friday of last week) and started pumping the foam. It was an interesting process to watch as the thin spray kept expanding and expanding. As mentioned in a previous blog we are installing 6.5″ of open cell foam in the ceilings and 2 inches of closed cell foam in the walls, basement, and crawlspace bands. We are also having 5″ of open cell foam sprayed between the main floor and finished basement for soundproofing.
Other items of note:
The dining room bar storage got built
Beams got a coat of solid stain
Trellis and window trim arrived
Liam is ready to move in! Unfortunately, the house is not…
Drain rough-in finalized
More master bath drain detail
Foam started in the dining room/playroom area and quickly spread to other parts of the house. All the skylights had to be covered up
Huge 3×10 trellis beams arrived
Another view of 3×10 trellis beams
That is a LOT of trellis beams!
The amazing, expanding open-cell foam
Newly stained painted beams were covered from overspray
Outside electric was ran for the waterfall. Gas was ran for the firepit and natural gas grill
Detail of natural gas stub for firepit and grill
You can achieve a devensec.com on line levitra healthier, more productive, much more rewarding life with minimal work. So always read the reviews and opinions of people generic viagra australia present over the internet. It is the finest online pharmacy where not only women can get solution for their problem of sexual weakness and to improve viagra canada pharmacies the performance in bed. The popularity of it provided way to launch on line viagra Kamagra fizz tablets, an effervescent tab that dissolves quickly in the body and starts working by improving blood flow into the penile region.
Dining room foam application almost finished
Trellis beams being unloaded from truck
Another shot of the lovely 3×10 beams
Beam was covered from dining room ceiling overspray. The stuff gets EVERYWHERE!
While we paid for 6.5 inches you can clearly see we received more in places, which is awesome to see. I wish I could have afforded 10″ of closed cell foam, but that was $42k LOL!
Hallway bath rough-in finalized. All Hansgrohe in this bathroom
Bathtub finally got covered up. It was taking a beating from all the sub contractors working around it
Cool shot of the open-cell foam in the dining room. Amazing how dampened the acoustics in the room were after install
More foam detail
Foam moving up the skylights quick
All the drips off the roof framing has to be shaved off. A lot of clean up to do…
The insulation inspection is supposed to happen on Thursday. Friday, the drywall is delivered for a Monday install!