Week 19 started off with a bang as the foam truck arrived (actually on Friday of last week) and started pumping the foam.  It was an interesting process to watch as the thin spray kept expanding and expanding.  As mentioned in a previous blog we are installing 6.5″ of open cell foam in the ceilings and 2 inches of closed cell foam in the walls, basement, and crawlspace bands.  We are also having 5″ of open cell foam sprayed between the main floor and finished basement for soundproofing.

Other items of note:

The dining room bar storage got built

Beams got a coat of solid stain

Trellis and window trim arrived

 

Liam is ready to move in!  Unfortunately, the house is not…

week19_5029

 

Drain rough-in finalized

week19_5026

 

More master bath drain detailweek19_5025

 

 

Foam started in the dining room/playroom area and quickly spread to other parts of the house.  All the skylights had to be covered up

week19_5023

 

Huge 3×10 trellis beams arrived

week19_5020

 

Another view of 3×10 trellis beams

week19_5019

 

That is a LOT of trellis beams!

week19_5018

 

The amazing, expanding open-cell foam

week19_5017

 

Newly stained painted beams were covered from overspray

week19_5016

 

Outside electric was ran for the waterfall.  Gas was ran for the firepit and natural gas grill

week19_5012

 

Detail of natural gas stub for firepit and grill
You can achieve a devensec.com on line levitra healthier, more productive, much more rewarding life with minimal work. So always read the reviews and opinions of people generic viagra australia present over the internet. It is the finest online pharmacy where not only women can get solution for their problem of sexual weakness and to improve viagra canada pharmacies the performance in bed. The popularity of it provided way to launch on line viagra Kamagra fizz tablets, an effervescent tab that dissolves quickly in the body and starts working by improving blood flow into the penile region.
week19_5011

 

Dining room foam application almost finished

week19_5009

 

Trellis beams being unloaded from truck

week19_5008

 

Another shot of the lovely 3×10 beams

week19_5007

 

Beam was covered from dining room ceiling overspray.  The stuff gets EVERYWHERE!

week19_5005

 

While we paid for 6.5 inches you can clearly see we received more in places, which is awesome to see.  I wish I could have afforded 10″ of closed cell foam,  but that was $42k LOL!

week19_5004

 

Hallway bath rough-in finalized.  All Hansgrohe in this bathroom

week19_4998

 

Bathtub finally got covered up.  It was taking a beating from all the sub contractors working around it

week19_4997

 

Cool shot of the open-cell foam in the dining room.  Amazing how dampened the acoustics in the room were after install

week19_4996

 

More foam detail

week19_4995

 

Foam moving up the skylights quick

week19_4994

 

All the drips off the roof framing has to be shaved off.  A lot of clean up to do…

week19_4993

 

The insulation inspection is supposed to happen on Thursday.  Friday, the drywall is delivered for a Monday install!