Week 9

Posted by on Mar 30, 2014 in The Palamino House | No Comments
Week 9

Week 9 saw the basement floor being poured, sealed crawlspace insulation installed, and a ton of framing materials dropped off in advance of the walls going up next week!

Plywood sheathing dropped off in advance of Week 10 framing!

week9_40

 

Dumpster drop off.  Sh*t just got real! 🙂

week9_64

 

Basement flooring got poured

week9_63

 

The clump of dirt in the back of courtesy of my son, Liam

week9_62

 

Another view of the basement pour

week9_61

 

Ribbed sill sealer apparently.  Just wanted to document all of the materials used as close as possible

week9_58

 

Anne is excited about the framing!

week9_57

 

View into crawlspace showing the thickness of the foam insulation

week9_56

 

More framing material

week9_55

 

We are using engineered floor trusses for a much more stable subfloor.  Nothing I hate worse than squeaky floors!

week9_54

 

Another view of the engineered flooring

week9_53

 

Detail of garage wall where utilities will come in from underground

week9_52
It will help both ways and you can make sure that the anti-impotency medicine, you are taking works perfectly. viagra canada is the best anti-impotency medicine and there could be no denying to this fact. This is a condition that draws huge amount of ridicule in the society and the social stigma associated with ED is higher in low and middle viagra generic india income families compared to upper class families. In case of tea or coffee lovers; one can switch to herbal tea. cipla sildenafil In a way it will exhibit an effect in cialis discount pharmacy subtle manner.
 

Utility acess

week9_51

 

Good stuff for flooring!

week9_50

 

More framing material

week9_49

 

Flooring detail

week9_48

 

Insulation around crawlspace that will eventually be sealed

week9_47

 

Insulation detail

week9_46

 

More insulation detail

week9_45

 

Planter detail

week9_44

 

Another view of poured concrete floor in basement

week9_43

 

Somebody left their drink…..

week9_42

 

Sheathing detail

week9_41

 

As you can tell, next week should be BIG!  Walls go UP! 🙂  I will update as the posts and beams arrive.

Leave a Reply