Week 9
Week 9 saw the basement floor being poured, sealed crawlspace insulation installed, and a ton of framing materials dropped off in advance of the walls going up next week!
Plywood sheathing dropped off in advance of Week 10 framing!
Dumpster drop off. Sh*t just got real! 🙂
Basement flooring got poured
The clump of dirt in the back of courtesy of my son, Liam
Another view of the basement pour
Ribbed sill sealer apparently. Just wanted to document all of the materials used as close as possible
Anne is excited about the framing!
View into crawlspace showing the thickness of the foam insulation
More framing material
We are using engineered floor trusses for a much more stable subfloor. Nothing I hate worse than squeaky floors!
Another view of the engineered flooring
Detail of garage wall where utilities will come in from underground
It will help both ways and you can make sure that the anti-impotency medicine, you are taking works perfectly. viagra canada is the best anti-impotency medicine and there could be no denying to this fact. This is a condition that draws huge amount of ridicule in the society and the social stigma associated with ED is higher in low and middle viagra generic india income families compared to upper class families. In case of tea or coffee lovers; one can switch to herbal tea. cipla sildenafil In a way it will exhibit an effect in cialis discount pharmacy subtle manner.
Utility acess
Good stuff for flooring!
More framing material
Flooring detail
Insulation around crawlspace that will eventually be sealed
Insulation detail
More insulation detail
Planter detail
Another view of poured concrete floor in basement
Somebody left their drink…..
Sheathing detail
As you can tell, next week should be BIG! Walls go UP! 🙂 I will update as the posts and beams arrive.