Wow!  Week 12 was an amazing week at the lot!  The framing guys were ON FIRE and really got a TON of the framing done!

View from the street.  You can see the skylights sprinkled around.  The left side will eventually look like one continuous piece, but the space behind it will be a trellis

week12_30

 

A view from the back of the home theater.  You can see the stairs on the right.  The wall directly in front will host a rear projection screen.  The projector will be in the room behind it, which will serve double duty as a storage room

week12_67

 

Nice, long stairs.  We are not sure yet if we are going to put up sheetrock, or remove the flat framing and expose the concrete.  The pool of water is leftover from a rain we had earlier in the week

week12_66

 

View of hallway in basement showing project rooms.  Gym is at end

week12_65

 

The beautiful, surprisingly private view from Liam’s large bedroom window

week12_64

 

View of the master bedroom.  There will be two corner windows.  Once again, surprisingly private thanks to the orientation of the home

week12_63

 

View from the north corner of the house looking forward.  Love the beams!

week12_62

 

Another view of the back of the house.  The cutout is all decking.  You can see how much of the deck is completely covered by the large eave.

week12_61

 

Patio entry door

week12_60

 

Large skylight above kitchen

week12_59

 

View out of dining/playroom

week12_58

 

View of smaller skylights along path of private hallway

week12_57

 

View of front entrance.  Roof opening is for planter.  There will be trellis beams installed

week12_56

 

View from south corner of house

week12_54

 

Garage entry.  Almost looks like flat roof from this angle!

week12_53

 

View of beams protruding from dining/playroom.  Trellis beams will be installed soon

week12_51

 

Southeast corner of house

week12_50

 

Corner beam detail.

week12_49

 

It will cialis wholesale help you in writing the rules and it will help you get to know everything. This medicament plays a vital role in life of impotence confronting men. tadalafil canada Kamagra can http://downtownsault.org/second-childhood/ buy levitra no prescription be found in the names of Kamagra oral jelly, Zenegra Forzest etc. It may also change the lining of the uterus also helps cialis viagra canada http://downtownsault.org/employment/ to decrease heavy menstrual bleeding. View from guest bedroom.  This portion of the roof will be trellis

week12_48

 

View of huge beam that runs the length of the basement

week12_47

 

Northwest corner of exterior showing large basement window openings and large eave overhangs

week12_46

 

Northwest corner again from farther back showing the huge north eave

week12_45

 

View from back of house.  2x4s not inside a wall cavity will be replaced with Douglas fir 4×4 posts

week12_43

 

View from north elevation.  Looks MASSIVE for a 2,500 sq ft house!

week12_42

 

Back of house looking into family room that will be a wall of glass.  Roof above will be trellis beams

week12_41

 

Northeast elevation looking west.  Surrounded by beautiful, mature trees

week12_40

 

View from higher elevation showing roof detail

week12_39

 

North elevation roof detail

week12_38

 

Elevated view of dining/playroom roofline

week12_37

 

Another view of dining/playroom

week12_36

 

Elevated view of garage entry

week12_35

 

Southeast corner of house.  Good view of mature trees and relationship to neighbor’s home

week12_34

 

Driveway area and level yard (eventually)  Hill to right will be carved out for turning around room.  Double retaining wall will be installed

week12_33

 

View of garage wall

week12_32

 

Guest bedroom.  Framed area will be closet and part of bedroom area.  Left half will be all glass

week12_31

 

Week 12 was definitely one of the more interesting weeks for the time-lapse construction camera!

Next week we meet with the electrician and plumber to make sure everyone knows where everything goes.  Framing should be completed by Tuesday or Wednesday and roof gets ordered!

 

Leave a Reply